Sign In | Join Free | My howtoaddlikebutton.com |
|
Brand Name : MY
Model Number : TOP 2000 B
Certification : CE
Place of Origin : CHINA
MOQ : one set
Price : pending
Payment Terms : Western Union, T/T,Payapl
Supply Ability : 9998 sets / month
Delivery Time : 2-5 working days
Packaging Details : weight : 23kg ,size : 50*30*35cm ,package : wooden case
Welding width : 2-4cm
welding speed : 3-15m/min
welding temperature : 350-450 degree
welding thickness : 0.22-2mm
welding power : 1800W
warranty : one year
110V Flex Banner Seam Welder / Heat Tarpaulin Welder /
Manufacturer with One year warranty
Our company sale many kinds of Banner Welding Machine .
This equipment is designed professionally for seaming PE , PVC ,Painting banners and other materials can be hot melt .
Details as below :
Machine name | Leister Hot Air gun Banner Welding Machine |
Other name | low cost hot air Plastic welding machine |
Electric heating | 1800W |
Motor | 15W |
Voltage | 110V/220V |
Frequency | 50-60HZ |
Temperature scope | 20-600 degree |
The thickness of material to be weld | 0.22-2mm |
Welding Area | 20-40mm |
Working Temperature | 400 degree (normal) |
Welder wheel | Aluminum wheel |
Welding Speed | 5-15m/min |
Package weight | 23kg |
package size | 50*30*35cm |
packing | wooden case |
Operation :
1. Make the cloth for seaming flat and put it underneath.Fix both ends by adhesive tape or something else.
2. The overlap width of the two pieces is about 3-mm, the width of the nozzle of hot seaming machine.
3. Put the machine nozzle between two overlap pieces.The press-wheel should be at left side of nozzle.The nozzle also need align with side of upper piece of cloth.
4. Switch on the motor power and then adjust speed.
5. Turn on the movement switch.
6. Press heating power key to adjust temperature.
7. Turn the bar by anticlockwise to fix the position to startup automatic movement.The machine will go along with the overlap path by itself.
8. Turn the bar by clockwise to cease the automatic work.
9. The operator should control the moving direction and make sure the nozzle connect both with upper and under piece of cloth.
notice:
1. During operating, if the surface cloth is dissolved and scorched or the cloth are not sticked together, please stop to adjust the temperature or speed.
2. During operating,if the seaming part is not in right position, please stop to adjust fixing position.
3. During operating, make sure clothes are flat so that stick together smoothly.
4. The hot wind of heater cannot touch the press-wheel or the rubber of press-wheel is easy to be burned down.
5. Adjust temperature to zero before turn off the heater.Switch off after 5-10 minutes
General instruction for safety : |
Keep the working place clean. Messing up and the disorderly working place cause disaster |
Choose the work place carefully and use the machine in a bright and dry circumstance. |
The electricity, controlling box and protective facilities have to be in the proper order after finishing daily work. The electrical power supply has to be switched off definitely |
The machine has to be stopped before gets maintenance or replacing the parts |
Use standard or indicated tools when dismantling or replacing parts |
For safety and the long life of the machine, please do not let the machine operates overtime. |
If any special incidents happened, please stop the machine first for repairing, And do not deal with the special incident with improper procedures. |
If the machine is operated on land, keep the work place clean and no dust there. If dust or something blocks the inhaling filter of heater, the heating wind can not come cut adequately and then temperature inside of filter will rise to let the heater burn down |
Moving,Dismantlement,Installation,Cleaning :
1. Any part of this machine being bumped of fallen can cause some damage impossible to be repaired.So please pay attention to carry it.It is suggested to move the machine by manpower and put it down carefully.
2. Please check if there is damage or missed parts after unpack the machine.Any problem, please contact us or the local agent immediately.
3. The place for installation must be flat and the floor is strong enough to support the machine and moreover, the installation place should close to power supply.
4. Keep the installation place no dust and avoiding sunshine.
5. Please sweep away the anti-rust oil from the machine with detergent and re-lubricate with light lubricating oil after installation.
Company Information :
Shen Zhen MingYang Digital Technology Co.,Ltd
We are a professional export trade company , with 7 years experience , sale many kinds of machine and materials about the Advertising Industry .
We assure you :
With good quality banner welder
Offer the best price
Arrange the fast delivery
Provide good after-sales service
![]() |
110V Pvc Welding Machine With 1 Year Warranty Images |